by NenadEM NenadEM

EUROmodul manufactured and installed custom made containers modular building as office and mini kitchen area for known client in Switzerland. According to client request, front and side facades are made of aluminium profiles and security glass, two PREMIUM entry doors made of safety glass and factory installed water inlet and outlet installations for mini kitchen and WC user space.

The object is made as three separate objects produced and equipped in EUROmodul production facility, transported and installed on location. The installation on location involved concrete basement preparation where the objects are positioned, levelling and connection to power supply. The object’s floor is connected and made flat and the connections are made watertight.

The object is made as three separate objects produced and equipped in EUROmodul production facility, transported and installed on location. The installation on location involved concrete basement preparation where the objects are positioned, levelling and connection to power supply. The object’s floor is connected and made flat and the connections are made watertight.

Insulation is made upon customer’s specification guidance, in roof, wall and bottom as well as within glass surfaces. Installation of inner elements consists of mini kitchen elements and a toilet cabin.

Heating and cooling of the building interior was made with air conditioning – inverter system. Outdoor unit AC unit is located on the building.

For the purposes of this demanding and fast serial production at a time when most other manufacturers and subcontractors are not working or are closed, EUROmodul has further expanded its production – storage area to the production of this project produced in parallel with the rest of the contracted works that EUROmodul delivered – student complex of prefabricated buildings in Berlin, manufacturing in Switzerland, the production line for Russia and Kazakhstan.